Home > Your Own Utilities > Stormwater Utility > Capital Projects

Featured Services

Other Public Works Areas

Your Own Utilities HomeYour AccountYour HomeYour BusinessOur CommunityAbout "YOU"Utility Online Services

Contact Us

SStormwater Management
408 North Adams Street
Tallahassee, FL 32301
850-891-6860

Ask a Question

Report a Problem

General Comments/Feedback

 

Related Links

Public Works

Floods

TAPP (Think About Personal Pollution) Program

Local Weather

Go Green Tallahassee

 

Share This Page

Submit to StumbleUpon  Submit to reddit  Add to Mixx!  Share on Facebook  Post to MySpace!

 

City of Tallahassee Logo

Betton Hills (Cline-Chamberlin) Stormwater Improvements

 
Water Division Page Wastewater Division Page Stormwater Management
Water Utility Home Page

Description

This project alleviated flooding of several homes in the Betton Hills area and eliminated overtopping of Cline Street by floodwaters during low frequency storms. Non-structural improvements consisted of acquisition and removal of three homes and flood-proofing two others. Structural improvements included excavating several feet of silt from McCord and Trescott Ponds and regrading the ponds; replacing the culvert under Cline Street and reconstructing the roadway at a higher elevation; excavating and regrading the channel from Trescott Pond to Laguna Pond and installing rock filled gabion baskets along the bottom and sides of the channel to protect it from erosion; replacing the culvert under Laguna Drive; extending Laguna Pond to the south; and constructing an outfall from Laguna pond to the ditch on Centerville Road.

Status

Completed

Location Map

Map of Project
Contact the Project Manager