Mission/Trimble Stormwater Improvements
Description
The purpose of this project is to reduce the frequent flooding of residential property by installing an improved drainage system. Two minor projects accomplished this goal. Phase 1 (northern area) conveys runoff from Tharpe Street to the main ditch. Phase 2 (southern area) replaced an undersized inlet and pipe from Peachtree Drive to the main ditch.
Status
Completed
Location Map





