Home > Your Own Utilities > Stormwater Utility > Capital Projects

Featured Services

Other Public Works Areas

Your Own Utilities HomeYour AccountYour HomeYour BusinessOur CommunityAbout "YOU"Utility Online Services

Contact Us

SStormwater Management
408 North Adams Street
Tallahassee, FL 32301
850-891-6860

Ask a Question

Report a Problem

General Comments/Feedback

 

Related Links

Public Works

Floods

TAPP (Think About Personal Pollution) Program

Local Weather

Go Green Tallahassee

 

Share This Page

Submit to StumbleUpon  Submit to reddit  Add to Mixx!  Share on Facebook  Post to MySpace!

 

City of Tallahassee Logo

Central Drainage Ditch Flood Relief

 
Water Division Page Wastewater Division Page Stormwater Management
Water Utility Home Page

Description

The purpose of this project is to develop and analyze solution alternatives that lower flood stages downstream of the FSU campus within the Central Drainage Ditch. If feasible, a secondary benefit of the project would be to provide development stormwater capacity for two future roadway projects, the widening of Gaines Street and the Jackson Bluff Road Extension, while reducing flood stages in the target area.

Status

Current
A feasibility study and preliminary engineering report, which summarizes the merits of each alternative analyzed was completed in August 2004.

Location Map

Map of Project
Contact the Project Manager